Search for Permits

Use the search below to get details on plan review activities and review comments on your plans. This information is updated Monday through Friday at 12:30 p.m. and 5:30 p.m.

Information returned on this page is valid through 6/27/2022. Incorporating the new permitting system data into this website is in progress. For current data requests, please contact PermitTechSupport@arlingtonva.us

 

  View Event Log.      View Status.       View Required Plan Review       View Printer Version.   
  
  
Search Again

 
ReviewEnergy
Review Date06/14/2016
StatusApproved
Comments
The permit submission indicates that new light switches, switched receptacles, lights and illuminated mirrors are part of the scope of work of the permit. Section C405.2.3 of the 2012 Virginia Energy Conservation Code (VECC) requires that a master control device is installed at the main room entry of each sleeping unit that controls all permanently installed luminaires and switched receptacles of the sleeping unit, including the bathroom. There does not appear to be a master switch that is capable of controlling all switched receptacles and permanently installed luminaires, such as but not limited to the illuminated mirrors. In the resubmission, show a control device that will satisfy the requirements of section C405.2.3 of the 2012 VECC. Include a one line diagram on the drawings showing the control device and include sufficient detail to illustrate compliance with section C405.2.3 of the 2012 VECC. Note that section C405.2.1 requires that each space with floor to ceiling partitions, such as a bathroom, must also have a manual control in the space so that an occupant in the space may control the lighting within that space.
  



  
 
Search Permits By:   Address
Permit Number
Date